Advertisement

Road and lane closures for Tuesday, June 7

June 07, 2011

Here is a list of road and lane closures for Tuesday, June 7:

• Work to expand the intersection of Massey Boulevard and Halfway Boulevard near Hagerstown continues, causing traffic to be backed up in each direction at different times. Roadwork is expected to continue there until Thanksgiving.

• Work to widen the intersection of Dual Highway and Edgewood Drive continues. Traffic is sometimes sluggish in both directions.

• Md. 550 in Thurmont, Md., is still closed in both directions between Eylers Valley Flint Road and Kelbaugh Road due to a mudslide that occurred April 17. The Maryland State Highway Administration says it could open to one lane very soon, but it is unsure when it will completely reopen.

• All lanes of both eastbound and westbound Interstate 70 just east of Md. 66 in Beaver Creek will be subject to closure at different times throughout the month of June for guardrail repair, the Maryland State Highway Administration is reporting. Work will be done on it between 7 p.m. and 7:30 a.m. each day.

• The I-81 bridge across the Potomac River will be undergoing inspection until June 26, the Maryland State Highway Administration's website is reporting. The inspection will cause one lane and the right shoulder of I-81 to be closed in both directions at different points in time between 5 a.m. and noon each day.

• One lane and both shoulders of U.S. 340 westbound will be closed at Md. 67 at different points in time for a sign inspection, the Maryland State Highway Administration's website is reporting. Closure is expected to last until June 17 between 9 p.m. and 5 a.m. each day.

Advertisement
The Herald-Mail Articles
|
|
|