Advertisement

Traffic on Mulberry, Franklin to be rerouted for construction

December 03, 1999

Traffic will be rerouted at the intersection of Mulberry Street and Franklin Street next week during trenching for the installation of reinforced concrete pipe storm drainage.

Mulberry Street between Franklin Street and Washington Street will be closed Monday through Friday between 9 a.m. and 3 p.m.

Traffic will be detoured from Mulberry Street to Franklin Street, west to Potomac Street, south to Washington Street and east to Mulberry Street. Motorists are advised to follow the posted detour.

Advertisement
The Herald-Mail Articles
|
|
|